# Task Manager System

> Detailed overview of AWX's task management and scheduling system

The task management system is responsible for deciding when tasks should be scheduled to run. It considers creation time, job dependencies, and capacity when choosing tasks to execute.

## System Components

The task management system consists of three separate components:

1. **Dependency Manager**
2. **Task Manager**
3. **Workflow Manager**

Each runs in a separate dispatched task and can run concurrently with one another.

## Scheduling Considerations

When choosing a task to run, the system considers:

1. **Creation time**: Earlier tasks are prioritized
2. **Job dependencies**: Dependent tasks wait for prerequisites
3. **Capacity**: Available resources on execution nodes

Independent tasks run in order of creation time, earliest first. Tasks with dependencies also run in creation time order within their dependency group.

## Dependency Manager

### Purpose

Responsible for looking at each pending task and determining whether it should create a dependency for that task.

### Example: Update on Launch

If `scm_update_on_launch` is enabled for a project, a project update will be created as a dependency when a job using that project is launched.

### Dependency Chain

Dependencies can have their own dependencies:

```
┌───────────┐
│           │  Created by web API call
│   Job A   │
│           │
└──────┬────┘
       │
       │
       ▼
┌───────────────┐
│  Inventory    │  Dependency of Job A
│  Source       │  Created by Dependency Manager
│  Update B     │
└───────┬────────┘
       │
       │
       ▼
┌───────────────┐
│   Project     │  Dependency of Inventory Source Update B
│   Update C    │  Created by Dependency Manager
└───────────────┘
```

### Dependency Manager Steps

1. **Get pending tasks** (parent tasks) that have `dependencies_processed = False`

2. **Cache related objects** as optimization:
   * Related projects
   * Related inventory sources

3. **Create dependencies** when needed:
   * Project or inventory update not already created
   * Last update failed
   * Last update outside cache timeout window
   * Additional logic for inventory updates

4. **Link dependencies** to parent task:
   * Use `dependent_jobs` field
   * Allows canceling parent if dependency fails

5. **Mark dependencies processed**:
   * Update parent tasks with `dependencies_processed = True`

6. **Check nested dependencies**:
   * Inventory source updates can have project update dependencies

### Update on Launch Logic

Projects and inventory sources marked as "update on launch" trigger updates when related job templates are launched.

**Rules:**

* Update triggered when related job template is launched
* Update **not** triggered if:
  * Recent update exists
  * Last update finished successfully
  * Finished time within configured cache window
* Failed updates always trigger new update
* `update on launch` jobs have `launch_type` of `dependent`
* If dependent job fails, related jobs also fail

## Task Manager

### Purpose

Responsible for looking at each pending task and determining whether Task Manager can start that task.

### Task Manager Steps

1. **Get tasks** that have `dependencies_processed = True`:
   * Pending tasks
   * Waiting tasks
   * Running tasks

2. **Process running tasks first**:
   * Build dependency graph
   * Account for currently consumed capacity
   * Track capacity in-memory:
     * `TaskManagerInstances`: Instance capacity tracking
     * `TaskManagerInstanceGroups`: Group capacity tracking

3. **For each pending task**:
   * Check if total tasks started this cycle > `start_task_limit`
   * Check if task has timed out
   * Check if task is blocked (by dependencies or concurrency rules)
   * Check if preferred instances have enough capacity

4. **Start the task**:
   * Change status to `waiting`
   * Submit task to dispatcher (via pg\_notify)

### Blocking Logic

**Hard blocking**: Database-backed via `dependent_jobs` field

* Job A will not run if any of its `dependent_jobs` are still running
* Represented in database

**Soft blocking**: In-memory tracking in Task Manager

* No database representation
* Example: Job A and Job B based on same template with `allow_simultaneous` disabled
* Job B blocked if Job A is running
* Determined via Dependency Graph

### Task Manager Rules

<Warning>
  These rules are strictly enforced by the Task Manager:
</Warning>

* Groups of blocked tasks run in chronological order
* Tasks run when capacity available (one job always allowed per instance group)
* Only one Project Update per Project at a time
* Only one Inventory Update per Inventory Source at a time
* Only one Job per Job Template at a time (unless `allow_simultaneous` is enabled)
* Only one System Job at a time

### Node Affinity Decider

The Task Manager decides which exact node a job will run on.

**Decision process:**

1. Construct set of groups where job can run
2. Consider user-configured group execution policy
3. Consider user-configured capacity
4. Traverse groups to find suitable node

**Node selection:**

* **First choice**: Node with largest remaining capacity that can fit the job
* **Fallback**: Largest *idle* node, even if job exceeds capacity
* This allows instances to exceed capacity limits when necessary

## Workflow Manager

### Purpose

Responsible for looking at each workflow job and determining if the next node can run.

### Workflow Manager Steps

1. **Get all running workflow jobs**

2. **Build workflow DAG** for each workflow job:
   * Directed Acyclic Graph of workflow nodes
   * Represents workflow structure

3. **For each workflow job**:
   * Check if timed out
   * Check if next node can start based on:
     * Previous node status
     * Success/failure/always logic
     * Convergence rules

4. **Create and start new tasks**:
   * Create task for next workflow node
   * Signal start

### Workflow Execution

Workflows execute based on node relationships:

```python theme={null}
# Example workflow
Node 1 (Job Template A)
  │
  ├── on_success ──► Node 2 (Job Template B)
  │
  └── on_failure ──► Node 3 (Job Template C)

Node 2
  │
  └── always ─────► Node 4 (Job Template D)
```

## System Architecture

### Entry Point: schedule()

Each manager has a single entry point: `schedule()`.

**Locking mechanism:**

```python theme={null}
def schedule():
    # Try to acquire global lock
    lock = acquire_lock('task_manager')
    if not lock:
        return  # Another instance is running
    
    try:
        # Process tasks
        process_pending_tasks()
    finally:
        release_lock(lock)
```

* Attempts to acquire single, global lock in database
* If lock cannot be acquired, method returns
* Lock indicates another instance is currently running

### Atomic Transactions

Each manager runs inside an atomic DB transaction:

```python theme={null}
with transaction.atomic():
    schedule()
```

**Benefits:**

* If dispatcher task is killed, no partial updates
* All-or-nothing execution
* Consistency guaranteed

### Hybrid Scheduler: Periodic + Event

Managers run in two ways:

**a) Periodically**: Background task (every 30 seconds by default)

**b) Event-triggered**: On job creation or completion

<Note>
  Workflow Manager doesn't run directly on a schedule - it piggy-backs off Task Manager. If Task Manager sees running workflow jobs, it schedules Workflow Manager.
</Note>

**Why both mechanisms?**

1. **Reduces latency**: Jobs start faster with event-triggered execution
2. **Fail-safe**: Periodic execution catches missed events
3. **Resilience**: System progresses even if events are missed

### Bulk Reschedule

Utility classes prevent scheduling too many managers:

```python theme={null}
with transaction.atomic():
    for t in tasks:
        if condition:
            ScheduleTaskManager.schedule()
```

`ScheduleTaskManager.schedule()` ensures only one Task Manager is scheduled after all tasks are processed, not one per task.

### Timing Out

Because of the global lock, only one manager can run at a time.

**Timeout protection:**

* Parent dispatcher process will SIGKILL stuck managers
* Timeout after a few minutes
* Allows new manager to take over

**Side effect mitigation:**

* Manager runs in transaction, so SIGKILL rolls back changes
* Next run re-processes same tasks
* **Risk**: Manager never progresses (times out every cycle)
* **Solution**: Manager checks time and bails out early if near timeout
* Commits partial progress before timeout
* Next cycle continues from where previous left off

## Job Lifecycle Detail

### Status Transitions

```
   API Request
       │
       ▼
   [pending] ───────────┐
       │                  │
       │   Dependency     │
       │   Manager        │
       │                  │
       ▼                  │
[dependencies_processed]  │
       │                  │
       │   Task           │
       │   Manager        │
       │                  │
       ▼                  │
   [waiting]              │
       │                  │
       │   Dispatcher     │
       │                  │
       ▼                  │
   [running]              │
       │                  │
       │   Job            │  blocked/
       │   Execution      │  no capacity/
       │                  │  dependencies
       ▼                  │
 [successful/failed] ◄───┘
    /error/canceled
```

### Status Meanings

| Status | State |
| - | - |
| **pending** | Job launched, but:<br />1. Not yet seen by scheduler<br />2. Blocked by another task<br />3. Not enough capacity |
| **waiting** | Job submitted to dispatcher via pg\_notify |
| **running** | Job is running on an AWX node |
| **successful** | Job finished with return code 0 |
| **failed** | Job finished with return code ≠ 0 |
| **error** | System failure |
| **canceled** | Manually canceled by user |

## Capacity Calculation

### Instance Capacity

Each instance has:

* **Total capacity**: Configured or calculated from resources
* **Consumed capacity**: Sum of running job impacts
* **Remaining capacity**: Total - Consumed

### Job Impact

Jobs consume capacity based on:

* **Forks**: Higher forks = higher impact
* **Job type**: Some jobs have fixed impact (e.g., system jobs = 5)

```python theme={null}
# Example capacity calculation
instance_capacity = 100
job_forks = 5
job_impact = calculate_impact(job_forks)  # Returns capacity consumption

if instance_capacity - consumed >= job_impact:
    # Job can run
    can_run = True
else:
    # Job must wait
    can_run = False
```

### Special Capacity Rule

<Warning>
  One job is always allowed to run per instance group, even if there isn't enough capacity. This prevents the system from becoming completely blocked.
</Warning>

## Managers Are Short-Lived

Manager instances are ephemeral:

1. **Created**: New instance on each run
2. **Load data**: Pull relevant data from database
3. **Process**: Execute scheduling logic
4. **Cleanup**: Instance destroyed

**Benefits:**

* No stale state
* Fresh data every cycle
* No memory leaks from long-running processes

## Debugging the Task Manager

### Checking Task Status

```python theme={null}
# In Django shell
from awx.main.models import UnifiedJob

# Find pending jobs
pending = UnifiedJob.objects.filter(status='pending')
for job in pending:
    print(f"Job {job.id}: {job.name}")
    print(f"  Dependencies processed: {job.dependencies_processed}")
    print(f"  Dependent jobs: {list(job.dependent_jobs.all())}")
```

### Forcing Task Manager Run

```python theme={null}
# Trigger task manager
from awx.main.scheduler.tasks import run_task_manager
run_task_manager.apply_async()
```

### Checking Capacity

```python theme={null}
from awx.main.models import Instance

for instance in Instance.objects.all():
    print(f"{instance.hostname}:")
    print(f"  Capacity: {instance.capacity}")
    print(f"  Consumed capacity: {instance.consumed_capacity}")
    print(f"  Remaining: {instance.capacity - instance.consumed_capacity}")
```

### Common Issues

**Jobs stuck in pending:**

* Check if dependencies are satisfied
* Check capacity on instance groups
* Check for blocking jobs (concurrent jobs disabled)
* Verify task manager is running

**Jobs not starting:**

* Check dispatcher is running: `awx-manage dispatcherctl status`
* Check for errors in logs: `/var/log/tower/`
* Verify database connectivity

## Performance Tuning

### start\_task\_limit

Limits tasks started per Task Manager cycle:

```python theme={null}
# In settings
START_TASK_LIMIT = 100  # Default
```

Higher values = more tasks start per cycle, but longer cycle time.

### Task Manager Period

How often Task Manager runs:

```python theme={null}
# Celery beat configuration
SCHEDULE = {
    'run_task_manager': {
        'task': 'awx.main.scheduler.tasks.run_task_manager',
        'schedule': timedelta(seconds=30),  # Adjust as needed
    }
}
```

### Database Indexes

Ensure indexes exist on:

* `status` field
* `dependencies_processed` field
* `created` timestamp

## Next Steps

* [Dispatcher System](/development/dispatcher)
* [Ansible Integration](/development/ansible-integration)
* [Architecture Overview](/development/architecture-overview)